Yew Tree Farm, Farnley Tyas

Location
Farnley Tyas, Huddersfield
Duration
2023 to ongoing
Value (Civils and Groundworks)
£750,000+
Role
Pre and Post Contract Quantity Surveyor
Image link

Yew Tree Farm involves the conversion of existing agricultural barns into residential units, with a significant proportion of the works centred around enabling works, groundworks and drainage infrastructure. The civils package has been a key driver of both cost and programme, with complex site conditions, existing structures and phased delivery requiring close commercial control throughout.

Scope of Works (Civils Focus)

  • Bulk excavation and site strip within a constrained rural setting
  • Formation of levels across multiple plots
  • Extensive mains and plot drainage infrastructure installation
  • Coordination with private treatment systems
  • Formation of new bellmouth access linking into the existing highway
  • Foundations and substructures designed to suit existing barn structures
  • New floor slab construction within retained buildings
  • Hardstanding, access routes and external works
  • Construction of block paved driveways and paved areas
  • Garden retaining walls and boundary treatments
  • Soft landscaping works to external areas
  • Phased works around retained structures

My Role

Managed the civils and groundworks packages from early cost planning through to ongoing valuation and variation control.

This included:

  • Preparing detailed cost plans for enabling and groundworks packages
  • Building up rates using labour, plant and material outputs
  • Managing 14+ interim valuations to date
  • Assessing and agreeing variations, particularly within drainage and groundworks
  • Working closely with the contractor to maintain commercial control as site conditions evolved
Key Challenges
  • Existing structures dictating foundation design and sequencing
  • Variable ground conditions impacting excavation and drainage works
  • Coordination of multiple plots with shared infrastructure
  • Ongoing drainage design development during construction
  • Managing a variation heavy civils package while maintaining cost visibility
Outcome

The civils and groundworks package has been delivered with clear commercial structure, with over £750,000 of works valued to date. Detailed tracking of labour, plant and materials has provided transparency across valuations and variations, ensuring both client and contractor retain confidence in the commercial position as the project progresses.